Question:Which of the following is correct about overhead variances?
A The controllable variance generally pertains to fixed overhead costs.
B The volume variance pertains solely to variable overhead costs.
C Standard hours actually worked are used in each variance.
D Budgeted overhead costs are based on the flexiable overhead budget.
+ AnswerD
+ Report