Question:Which of the following is correct about overhead variances? 

A The controllable variance generally pertains to fixed overhead costs. 

B The volume variance pertains solely to variable overhead costs. 

C Standard hours actually worked are used in each variance. 

D Budgeted overhead costs are based on the flexiable overhead budget. 

+ Answer